REVISED RATE SCHEDULE
NEW ORLEANS BUNKERING
EFFECTIVE April 15, 2008
(Rates may change at any given time with three days notice)
New Orleans Harbor (Mile 76.0 to Mile 120.1)
Flat Rate: $9575.00 or $8.87 per metric ton, whichever is greater.
SHIPS WILL BE INVOICED FOR TOTAL QUANTITIES ORDERED AND LOADED.
OUT OF PORT CHARGES:
South: Mile 75.9 - 56.0 $ 4860.00
55.9 - 47.0 7276.00
46.9 - 26.0 12146.00
25.9 - 0.0 16970.00
North: Mile 120.1 – 140.0 $ 5345.00
140.1 - 160.0 10667.00
160.1 - 180.0 16010.00
180.1 - 200.0 21332.00
200.1 - 235.0 28502.00
INDUSTRIAL CANAL DELIVERIES:
Deliveries in the Industrial Canal will be made at the basic HARBOR RATE plus a lock fee of $1714.00. All standby time at the locks will be at the stated demurrage rate minus four (4) hours free time.
DEMURRAGE RATE:
Demurrage will be charged for any delays in excess of allowed time which is not the fault of Progressive Barge Line, Inc.
Boat - $360.00
Barge - $ 110.00
NOTICE OF DELIVERY
Bunker buyer or Vessel¡¯s local agent shall give Progressive Barge Line, Inc. (Seller¡¯s local representative at the delivery port) at least forty-eight (48) hours¡¯ advanced notice of each delivery, confirming product, quantities, delivery date, time and location. Where forty-eight (48) hours¡¯ advance notice is not given; then Progressive Barge Line, Inc. shall in normal circumstances use reasonable efforts to make the bunker delivery in a timely manner.
EQUIPMENT ACCEPTABILITY:
Once a barge has been deemed acceptable for loading by the customer's loading facility personnel and/or independent surveyor, PBL will be released from any and all responsibility and liability for claims arising out of product quality disputes unless said problems were the direct result of PBL equipment failure or PBL personnel error.
LOADING REQUIREMENTS:
No product will be loaded unless the temperature is at least 125 Degrees Fahrenheit at the shore tank. Progressive Barge Line Inc. will not be responsible for picking up suction and/ or quality of fuel samples for stems of 50 metric tons or less.
SHIP CONNECTION ARE MADE BY SHIP VESSEL'S PERSONNEL:
PBL barges are equipped with a minimum of 70 feet of flow through cargo boom and hose install on the deck. In addition, each boat carries a supply of standard reducers. The demurrage rate will apply for all delays caused by difficult connections requiring extra hose or special reducers in order to make the ship's connection.
STEAMING:
Any barges requiring steaming due to cold product loaded will be at the demurrage rate.
PORT TARIFFS:
PBL is not responsible for any charges incurred for any dock, port or harbor tariffs.
GOVERNMENTAL DELAYS:
Any delays due to government agencies (USCG, U.S. Customs, U.S. Army Corps of Engineers) will be charged at the stated demurrage rate.
LOAD/DISCHARGE LAYTIME:
Loading laytime based on 150 metric tons per hour (approximately 1,000 barrels per hour) plus four (4) hours free time.
Discharge laytime based on 150 metric tons per hour (approximately 1,000 barrels per hour) plus four (4) hours free time.
ABORTED DELIVERY
Aborted delivery rate of $9575.00 (flat rate) or $8.87 per metric ton, whichever is greater.
PUMPBACK FOR RETAINS:
Extra charges will begin from departure of vessel until all product is pumped off, at the posted demurrage rate of $470.00 per hour or $2975.00, whichever is greater.
DEBUNKER RATES:
From departure of Progressive Barge Line fleet until return to Progressive Barge Line fleet a our flat rate fee of $9575.00 or $470.00 per hour, whichever is greater.
TERMS:
Net upon receipt of invoice.
MISSISSIPPI RIVER MILEAGE POINTS
HEAD OF PASSES TO BATON ROUGE, LOUISIANA
MILE 0.0 TO MILE 25.9 $16970.00 ____MILE
HEAD OF PASSES 0.0
PILOTTOWN ANCHORAGE 1.5 - 6.7
LOWER VENICE ANCHORAGE 8.0 - 9.6
UPPER VENICE ANCHORAGE 10.0 - 11.2
BAPTISTE ANCHORAGE 11.3
BOOTHVILLE ANCHORAGE 12.2 - 18.5
OSTRICA ANCHORAGE 23.5 - 24.4
GULF OSTRICA (CHEVRON) 25.7
MILE 26.0 TO MILE 46.9 $12146.00 ____MILE
CHEVRON-EMPIRE, LA. (CAL-KY DOCK) 27.2
PORT SULPHUR ANCHORAGE 37.5 - 39.7
FREEPORT SULPHUR 39.4
MAGNOLIA ANCHORAGE 45.5 - 46.9
MILE 47.0 TO MILE 55.9 $7276.00 ____MILE
POINT CELESTE 50.0 - 51.0
DAVANT ANCHORAGE 53.5 - 54.5
TECO COAL TRANSFER 55.4
MILE 56.0 TO MILE 75.9 $4860.00 ____MILE
IMTT COAL (MYRTLE GROVE) 57.0
HARVEST STATE GRAIN - MYRTLE GROVE 61.5
CONOCO - ALLIANCE 63.0
LAGRANGE ANCHORAGE 63.8 - 65.8
WILLS POINT ANCHORAGE 66.5 - 67.6
DOCKSIDE ANCHORAGE 69.9 - 71.5
CHEVRON - OAK POINT 72.6
BELLE CHASSE ANCHORAGE 73.1 - 75.2
NEW ORLEANS HARBOR LIMITS - MILE 76.0 TO MILE 120.0 MILE
LOWER 12 MILE ANCHORAGE 78.5 - 80.8
LOWER 9 MILE ANCHORAGE 82.7 - 85.0
MURPHY OIL - MEREAUX 87.0
EXXON-MOBIL CHALMETTE 88.2
NEW ORLEANS GENERAL ANCHORAGE 89.3 - 90.9
DOMINO SUGAR - CHALMETTE 90.8
GENERAL ANCHORAGE 90.9 - 91.6
INNER HARBOR NAV. CANAL (IND. LOCKS) 92.6
GOV. NICHOLLS TRAFFIC LIGHT 94.3
NEW ORLEANS, FOOT OF CANAL ST. 95.0
JOHN W. STONE - GRETNA 96.5
IMTT - GRETNA 97.2
HARVEY LOCKS 98.3
KINDER MORGAN - HARVEY 98.4
ADAMS DOCK 98.9
CHEVRON-TEXACO MARRERO 99.0
MAGELLAN MARRERO 99.1
PROGRESSIVE BARGE LINE 101.6
VOLPAK - WESTWEGO 102.4
T.T. BARGE 104.5
ZITO BOUY 105.0
HUEY P. LONG BRIDGE 106.1
AVONDALE SHIPYARDS 106.6 - 107.8
IMTT - AVONDALE 108.7
LOWER KENNER BEND ANCHORAGE 113.5 - 114.3
KENNER BEND ANCHORAGE 114.7 - 115.6
AMA ANCHORAGE 115.5 - 117.3
ADM GROMARK 117.6
IMTT ST. ROSE 118.7
BUNGE GRAIN ELEVATOR 120.0
MILE 120.1 TO MILE 140.0 $5345.00 _______MILE
ST. CHARLES GRAIN- DESTREHAN 120.5
ADM BOUY 121.0
VALERO - GOODHOPE 125.7
MOTIVA NORCO 126.9
BONNE CARRE ANCHORAGE 127.3 - 128.8
LAPLACE ANCHORAGE 134.7 - 135.0
GODCHAUX SUGAR - RESERVE 136.0
RESERVE ANCHORAGE 137.0 - 137.5
MARATHON OIL - GARYVILLE 140.0
MILE 140.1 TO MILE 160.0 $10667.00 _____MILE
APEX-MT. AIRY REFINERY 143.4
KAISER ALUMINUM 145.1
LOWER GRAND VIEW ANCHORAGE 146.5 - 147.1
UPPER GRAND VIEW ANCHORAGE 147.7 - 148.8
PEAVY GRAIN 150.4
PAULINA ANCHORAGE 154.0
DELTA BULK 157
CAPLINE - ST. JAMES 159.5
MILE 160.1 TO MILE 180.0 $16010.00_____MILE
ZENNOH GRAIN - CONVENT 163.8
LOWER SUNSHINE ANCHORAGE 165.0 - 165.9
UPPER SUNSHINE ANCHORAGE 166.3 - 167.0
MOTIVA CONVENT 168.1
BURNSIDE TERMINAL 170.0
DARROW 172 TO 175 FLEET 172.0 - 175.0
MILE 180.1 TO MILE 200.0 $21332.00 _____MILE
COOPER DARROW 181.0
ALLIED CHEMICAL - GEISMAR 186.8
SUNOCO TERMINAL 198.2
MILE 200.1 TO MILE 235.0 $28502.00 MILE
SCURLOCK OIL - SUNSHINE 203.8
DOW CHEMICAL - PLAQUEMINE 210.0
BATON ROUGE GENERAL ANCHORAGE 225.8 - 227.3
SUN OIL - BATON ROUGE 227.5
CARGILL 227.8
PORT ALLEN LOCKS 228.4
LOWER BATON ROUGE ANCHORAGE 228.5 - 229.0
APEX OIL - PORT ALLEN 229.1
MIDDLE BATON ROUGE ANCHORAGE 229.6 - 229.8
UPPER BATON ROUGE ANCHORAGE 230.6 - 231.0
PLACID OIL - PORT ALLEN 231.8
EXXON - BATON ROUGE 232.0
KAISER ALUMINUM - BATON ROUGE 233.7
|